The Henhaven is shipped via UPS. It arrives in five boxes. The basic steps for putting it together are as follows:
Assemble the Wheel Assembly.
084-back panel.JPG (10856 bytes) Assemble 3 walls, install the wheel assembly and floor.
090-nestin.JPG (8514 bytes) Install nests and tarp.

The tarp makes cleaning a snap. Since the tarp and the wire floor "breathe", the manure stays dry and does not smell. To clean the unit, remove the nest and tarp. Shake the tarp and then replace the nest and tarp. The tarp is only used in very cold weather.

Install Roost Poles 108 - roof lifted.JPG (7600 bytes)
Install the front wall
120 sunroom.JPG (11106 bytes) Build and attach sunroom.

Sunroom top and front wall.

 

Insert the nipple waterer in the "hole" in the sunroom.

 

Install the roof frame

Install the roof panels. 
The roof slides forward to open and is held in place by roof sliders. This photo is taken from inside of the Henhaven. The metal sliders are held in place by two 1/4" nuts.
Install the feeder and you are done.

   [ Contact Information ]

Send mail to webmaster@henspa.com. Questions? Go to Common Questions.
Copyright © 1999 Egganic Industries - Last modified: July 21, 2008